November 6, 2026 · 9 min read
Arcade Machine Game-Mix Planning Brief for First China Orders
A buyer-owned planning brief for overseas FEC and arcade teams choosing a first China-sourced machine mix without treating supplier availability as venue, technical, or commercial approval.
An overseas family-entertainment-center team is preparing its first China order. The venue has a target opening window, a rough floor plan, and a long spreadsheet of driving games, claw machines, redemption cabinets, basketball games, and simulators gathered from supplier catalogues. Every product photo looks plausible in isolation. The problem appears when the buyer tries to decide what belongs in the first order: three visually similar cabinets compete for the same guest moment, a proposed simulator needs a review that no one has scheduled, and a supplier's available stock is starting to dictate the mix. Before asking for a final quotation, the team needs a buyer-owned game-mix planning brief that makes each candidate's role, unknowns, and decision owner visible.
This guide is for overseas buyers planning an arcade machine game mix with China suppliers. It is a sourcing-coordination tool, not a venue design, revenue forecast, technical specification, safety assessment, content-rights clearance, electrical review, accessibility review, installation plan, or destination-market compliance approval. QING SHAN can coordinate supplier questions and maintain the buyer's comparison record; the buyer and appropriately qualified advisers retain all product, commercial, technical, legal, and site decisions.
Key takeaways
- Start with the guest occasion and operating intent, not a supplier catalogue or a fixed category percentage.
- Give every candidate machine a declared role in the proposed mix; a popular-looking product is not automatically a useful addition.
- Separate buyer priorities, supplier-stated product information, and unresolved approvals in one record.
- Treat supplier availability, photos, and quotations as inputs to a decision—not as evidence that an item fits the venue or is approved for purchase.
- Keep the first-order shortlist small enough that named buyer owners can compare alternatives and record why each line stays, moves to reserve, or is removed.
Procurement stage map
| Procurement stage | Buyer decision | Evidence to control |
|---|---|---|
| Operating brief | What experience is the first order meant to support? | Buyer-owned audience, visit pattern, operating concept, named decision owner |
| Candidate capture | What has actually been proposed? | Supplier name, product link or catalogue page, model identifier, dated photo/video reference |
| Mix review | What role does each candidate serve, and what overlaps? | Candidate cards, role labels, comparison notes, unresolved questions |
| Supplier clarification | What can each supplier state about its offered item? | Written response tied to the exact model and revision, quotation assumptions |
| Buyer approval | Which lines proceed to an RFQ or reserve list? | Dated approval record, exclusions, conditions, technical/commercial owners |
| Order control | What becomes the approved order baseline? | Separate controlled configuration and commercial documents |
1. Define the operating brief before the shortlist
Write a short buyer-owned brief before assembling products. It can state the intended guest groups, the kinds of visit the venue expects to support, whether the order is an initial launch or a refresh, the operating model the buyer is considering, and the people who can approve commercial and technical decisions. It should also state what is not yet known.
This is deliberately not a promise about attendance, earnings, guest behavior, or the suitability of any game. Its purpose is to stop a mixed catalogue from becoming the strategy by default. A supplier can then answer questions about specific products without being asked to infer the venue's business model.
2. Assign each candidate a guest-experience role
Use broad, buyer-defined role labels such as quick solo play, shared play, spectator draw, redemption-oriented play, skill challenge, or group activity. The labels are planning aids, not industry rules and not product claims. A machine may have more than one possible role, but the buyer should name the primary role it is expected to serve in this particular order.
If two candidates have the same primary role, record why both remain. The reason may be a different form factor, a different operating concept, a distinct guest group, or simply a deliberate alternative pending review. If no reason is recorded, keep one as a reserve candidate rather than letting duplicate roles fill the first order.
3. Build one candidate card per proposed line
Do not compare an entire supplier catalogue against another supplier catalogue. Create one card for each candidate line. A useful card captures the supplier's stated model name or number, the buyer's role label, the visual reference received, quantity under consideration, known options, the buyer's questions, and the named person responsible for the next decision.
Leave fields blank when information is not available. A blank field is more useful than a guessed specification. In particular, do not convert a catalogue image into an assumption about installed features, supported content, payment integration, electrical arrangement, safety, accessibility, local approval, or performance.
4. Compare the first-order mix without forcing a formula
The planning conversation should compare coverage and concentration, rather than apply a universal ratio of machine types. Ask whether the current list is concentrated in one kind of guest moment, whether an item is present only because it is readily quoted, and whether a proposed machine has an owner willing to review its unresolved questions.
Keep commercial comparison separate from mix planning. Unit price, minimum order quantity, lead time, and freight assumptions may matter later, but they do not establish that a product belongs in the intended guest experience. Label every comparison field as buyer-stated, supplier-stated, or pending buyer approval so that a later RFQ does not hide the distinction.
5. Ask suppliers for bounded, model-specific responses
After the buyer has reduced the list, request information against the precise candidate card. Ask suppliers to identify the offered model, revision or option where applicable, what is included or excluded from their quotation, current photo or video references, the date of their response, and any assumptions they want the buyer to confirm.
This is supplier coordination, not a request for a supplier to approve a venue, select the buyer's mix, or guarantee guest demand. The buyer should direct technical, electrical, safety, software, legal, content-rights, and destination-market questions to the appropriate qualified owner. A supplier's answer may be useful evidence, but it is not a substitute for that review.
6. Approve a planning shortlist, then control the order separately
Close the planning brief with three statuses: proceed to RFQ, keep as reserve, or remove. For each line proceeding to RFQ, name the buyer owner and list any condition that must be resolved before a purchase decision. A planning shortlist is not an order release and should not be treated as a configuration freeze.
Once the buyer selects order lines, use a separate controlled record for exact models, options, artwork, language, quantities, commercial terms, and approvals. That distinction keeps this early portfolio decision from being confused with the configuration-control process needed later in an order.
Evidence checklist
- Buyer-owned operating brief with the purpose and scope of the first order
- Candidate card for every proposed machine line
- Supplier identity and the dated catalogue, photo, or video reference for each card
- Buyer-defined primary experience role and a note for any role overlap
- Written supplier response tied to the exact quoted model or option
- Named buyer owners for commercial, technical, site, and approval questions
- A dated proceed / reserve / remove decision for each candidate
- A separate list of conditions that must be resolved before order release
Red flags
- A product stays on the list only because it is immediately available or pictured prominently in a catalogue.
- Several candidates appear to serve the same role, but no one can explain the intended difference.
- A supplier quotation uses a broad product name with no model-level link to the buyer's candidate card.
- The team calls a planning shortlist an “approved order” before technical, site, commercial, or rights questions have named owners.
- Product photos, chat messages, and quotations refer to different versions without a controlled buyer decision.
Common mistakes
The most common mistake is asking one party to solve every decision in a single spreadsheet. Mix planning, product sourcing, venue design, technical fit, commercial approval, and order configuration have different evidence and different owners. Another is treating a fixed category formula as a substitute for an operating brief. A repeatable process is more valuable: state the buyer's intent, make the candidates comparable, preserve unknowns, and move only the reviewed lines to the next stage.
Reusable practical asset: first-order game-mix planning card
Copy this table into the buyer's working file. One row represents one proposed order line, not an entire catalogue category.
| Field | Buyer entry |
|---|---|
| Candidate ID and date | |
| Supplier and stated model / option | |
| Dated source reference | Catalogue page, photo, video, or quotation reference |
| Proposed quantity | |
| Primary experience role | Buyer-defined label |
| Why it belongs in this first order | |
| Similar candidate or overlap note | |
| Supplier-stated inclusions / exclusions | |
| Open technical, site, commercial, or rights question | |
| Named buyer decision owner | |
| Current status | Proceed to RFQ / reserve / remove |
| Condition before order release |
QING SHAN service boundaries
QING SHAN acts as a trading-company and sourcing-coordination partner. We can organize candidate records, relay precise supplier questions, collect supplier-stated quotations and media, follow up on unanswered items, and support logistics documentation when an order is ready. We do not select the venue's product strategy, forecast revenue, approve a product's technical or site suitability, validate safety or regulatory compliance, clear intellectual-property or content rights, certify electrical arrangements, or accept products on the buyer's behalf.
How QING SHAN can help
For a buyer that already has an operating brief, QING SHAN can turn it into a disciplined supplier-coordination workflow: create a candidate register, request model-specific responses, keep supplier statements attached to the right line, flag unanswered fields, and prepare a comparable quotation pack for the buyer's own review. This helps the buyer retain control of the game-mix decision while reducing the risk that informal chat messages become untracked order assumptions.
FAQ
Should a supplier choose our arcade machine mix?
A supplier can describe its offered products and may share its own product information. The buyer should retain the mix decision because it depends on the buyer's operating concept, site, commercial priorities, and approvals.
Can a catalogue photo serve as the product specification?
No. Keep a photo as a visual reference and request a model-specific written response for the item under consideration. A photo alone does not establish included options, technical characteristics, or approval for the buyer's venue.
Do we need a fixed percentage of each game category?
No universal percentage is assumed in this brief. Use buyer-defined roles and a documented reason for each candidate. Any financial, demand, or layout assumptions should be reviewed by the buyer's appropriate commercial and site advisers.
When should configuration details be frozen?
Only after the buyer has moved from planning to a controlled order decision. Keep the game-mix planning card separate from the later configuration, artwork, language, option, quantity, and commercial approval record.
Continue the procurement workflow
Related services
Related insights